
Related Articles
SCHEDULED POWER SERVICE INTERRUPTION
GAWAIN: Pole relocation, conductor tensioning, clearing of backbone lines and other maintenance works. PETSA: January 10, 2026 (Sabado) ORAS: 7:00AM – 4:00PM (9 Oras) APEKTADONG LUGAR: > Brgys. V, VI, VII, Awitan, Bagasbas, Borabod, Gubat, Vinzons Ave. (mula Elevated Plaza hanggang Mabini Colleges), at bahagi ng Brgys. VIII, Lag-on, at Gahonon sa bayan ng DAET; […]
Talisay – December 2025 Billing Month Due Date
Ipinapaalam sa ating mga Member-Consumer-Owner (MCO) sa bayan ng Talisay na ang due date sa inyong bayarin sa kuryente ay sa January 16, at hindi January 17, para sa may account number na nagsisimula sa: 3502 – Binanuaan 3503 – Poblacion 3504 – Bonifacio St. 3505 – San Francisco 3507 – San Isidro 3508 – […]
Disconnection – Labo, San Vicente at Daet
UPDATED: Magkakaroon ng DISCONNECTION sa mga sumusunod na lugar sa bayan ng LABO, SAN VICENTE at DAET: AUGUST 26, 2021 (HUWEBES) – Tulay na Lupa – Cabusay – Fundado – Rizal St. / Dalas – Bautista – Malasugui / Guinacutan – Iberica – Plaridel / Dalas – Malangcao-basud / Core Shelter – Lugui / Mabilo […]

