CANORECO Advisories Scheduled Power Service Interruptions

SCHEDULED POWER SERVICE INTERRUPTION

GAWAIN: Correction of identified hotspot at Tawig Substation, feeder metering, line load balancing, clearing of line obstructions and other preventive maintenance activities along 13.2kV backbone line. PETSA: April 11, 2026 (Sabado) ORAS: 8:00 AM – 5:00 PM (9 Oras) APEKTADONG LUGAR: > Buong bayan PARACALE maliban sa Brgys. Awitan, Bakal, Dancalan, Labnig, Mampungo, Mangkasay, at […]

Scheduled Power Service Interruptions

NATIONAL GRID CORPORATION OF THE PHILIPPINES, INC. (NGCP) Advisory: SCHEDULED POWER SERVICE INTERRUPTION

GAWAIN: Load transferring of 5LI1LBO-TLS back to 8Z-XF02LBO. PETSA: March 21, 2026 (Sabado) ORAS: 6:00 AM – 6:30 AM (30 Minuto) APEKTADONG LUGAR: > Mga bayan ng MERCEDES, BASUD, SAN LORENZO RUIZ, DAET, SAN VICENTE, TALISAY, VINZONS, LABO, CAPALONGA, at SANTA ELENA; > Brgys. Awitan, Bakal, Dancalan, Labnig, Mampungo, Mangkasay, at Tabas sa bayan ng […]

CANORECO Advisories Scheduled Power Service Interruptions

SCHEDULED POWER SERVICE INTERRUPTION

GAWAIN: NEA substation PMS, replacement of old 13.2kV pole, correction of identified hotspot and other preventive maintenance works. PETSA: March 15, 2026 (Linggo) ORAS: 7:00 AM – 5:00 PM (10 Oras) APEKTADONG LUGAR: > Buong bayan ng SANTA ELENA; > Brgys. Villa Aurora, Villa Belen, at San Antonio sa bayan ng CAPALONGA; > Brgys. Anameam, […]

Scheduled Power Service Interruptions

NATIONAL GRID CORPORATION OF THE PHILIPPINES, INC. (NGCP) Advisory: SCHEDULED POWER SERVICE INTERRUPTION

UPDATE: Changes in time on some areas. ========= PETSA: February 28, 2026 (Sabado) ========= 1. GAWAIN: Sag corrections (Labo-Panganiban-Paracale 69kV Line). ORAS: 6:30 AM – 12:00 PM (5.5 Oras) APEKTADONG LUGAR: > Brgys. Bagumbayan, Batobalani, Calaburnay, Capacuan, Casalugan, Dagang, Dalnac, Gumaus, Malacbang, Malaguit, Maybato, Palanas, Pinagbirayan Malaki, Pinagbirayan Munti, Poblacion Norte, Poblacion Sur, Talusan, Tawig, […]

CANORECO Advisories Scheduled Power Service Interruptions

SCHEDULED POWER SERVICE INTERRUPTION

GAWAIN: Relocation of pole, installation of intermediate pole, clearing of line right-of-way (ROW) obstructions and other preventive maintenance activities. PETSA: February 14, 2026 (Sabado) ORAS: 8:00 AM – 4:00 PM (8 Oras) APEKTADONG LUGAR: > Brgys. Angas, Hinampacan, Lidong, Mampili, Mandazo, Mangcamagong, Manmuntay, Mocong, Oliva, Pinagwarasan, Taba-Taba, at Taisan (River Block Barangays) sa bayan ng […]