Last Saturday (June 30, 2018), CANORECO conducted preventive maintenance of Calintaan and Lag-on substation, In line with this CANORECO also conducted massive right of way clearing in certain areas which has heavy vegetations near the backbone and lateral lines, Aside from the preventive maintenance of substation, CANORECO also conducted replacement of rotten or dilapidated poles and other maintenance activities. CANORECO staffs and employees work together to further improve the provision of good service to their member-consumers.
Area 1 team replaced pin insulator at a pole near Lag-on substation.
ASIAPHIL conducted maintenance works at Lag-on substation
Sub-tx team replaced overhead guy wire at 69KV pole near Calintaan substation
CWMPC team conducted ROW clearing at Exciban, Labo
DPWH also assisted and conducted clearing of heavy vegetations at Talobatib, labo
Area 3 team replaced rotten pole at mangcamagong road
ASIAPHIL conducted maintenance works at Calintaan Substation
Sub-tx team conducted maintenance works at the tapping point on lag-on substationΒ
C-24 construction team replaced rotten pole and conducted ROW clearing at Basud