Sa Power Service Interruption na ini-schedule ng CANORECO Area 3 Office (A3O) noong September 26, 2020 (Sabado) mula 8:00 ng umaga hanggang 5:00 ng hapon sa Brgy. Tawig, Tugos, Casalugan, Poblacion Norte, Poblacion Sur, Palanas, Malaguit, Labnig at Bagumbayan sa bayan ng Paracale, nagawa ang mga sumusunod na maintenance work:
– Re-tapped poles with C4-1 and C-8 assemblies at Paracale Lines
– Fixed secondary line tapping at Pole #139 (C1) at P-7A, Brgy. Bagumbayan
– Replaced insulators at Pole #143 (C2) near Ice Plant
– Replaced suspension insulators at Pole #047 (C8) at Brgy. Bagumbayan to Sitio Pulang Daga Rd. cor. Ligaya St.
– Fixed primary tapping of Sitio Bulabod, P-5, Brgy. Tawig
– Re-tapped two (2) distribution cutout at Pole #023 (C14)
– Replaced insulators at Pole #029 (C1) at Brgy. Tawig, Paracale
– Clearing of lines at Tawig Feeder 2 Paracale Line coverage area
– Replaced two (2) rotten poles at Sitio Matanlang, Brgy. Tawig; two (2) at P-5. Brgy. Tugos; three (3) at Sto. NiΓ±o St., Poblacion Norte; and one (1) at Sitio Pulang Daga, Brgy. Bagumbayan
Para sa karagdagang impormasyon, makipag-ugnayan sa Area 3 Office (A3O) sa cellphone no. 09109346328.